Let's Talk Cabling!
Welcome to "Let's Talk Cabling" – the award-winning podcast that's your ultimate gateway to the dynamic world of information and communications technology (ICT). If you're aged 18 to 40 and thrive in the ICT industry or simply curious about it, this podcast is your must-listen destination!
🏆 Award-Winning Excellence: "Let's Talk Cabling" is proud to have earned recognition for its outstanding content and invaluable insights in the ICT field. Our commitment to educating and empowering individuals like you has garnered us a prestigious industry award, a testament to the quality of information you'll find here.
🌐 Explore the ICT Universe: Join us as we delve deep into the realm of designing, installing, certifying, estimating, and project managing low voltage projects across diverse industries. Whether you're an industry veteran or just starting your journey, our engaging discussions will enrich your knowledge and skills.
🎙️ Story-Driven Learning: We follow the captivating StoryBrand methodology to ensure every episode is not just informative but also captivating. Expect real-world anecdotes, expert interviews, and relatable narratives that make learning about cabling and ICT a fascinating experience.
🚀 Subscribe Today: Don't miss out on the power of knowledge! Hit that subscribe button and embark on an exciting journey with "Let's Talk Cabling." Whether you're on YouTube, TikTok, LinkedIn, Instagram, or your preferred podcast platform, we're here to educate, encourage, and enrich your ICT endeavors. Remember, in the world of ICT, knowledge is power, and we're here to empower you.
Join our growing community of ICT enthusiasts today!
#cbrcdd #rcdd #wiremonkey #BICSI
Let's Talk Cabling!
Ten Practical Tips For Designing A Reliable Access Control System Part 2
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
We break down what makes an access control and fire alarm related panel build dependable when the power drops and the service calls start piling up. We share practical rules for battery backup, labeling, wire routing, ventilation, documentation, and the codes and certifications that shape life-safety work.
• planning battery backup time and enclosure space limits
• learning why repeated fire alarm faults trigger fire watch
• building cleaner panels through consistent labeling schemes
• pairing port based labels with plain English locations
• using drip loops and square routing for serviceability
• keeping wiring tidy with Velcro and smart slack
• avoiding heat problems with proper ventilation choices
• budgeting for expansion without overspending up front
• choosing machine labels and dating batteries on install
• closing projects with as builts and equipment inventories
• understanding IBC and NFPA 101 impacts on egress doors
• navigating manufacturer training plus NICET style requirements by jurisdiction
Let me know down below if you like this kind of content. Should I do more of it?
And also don't forget that we got our three CEC courses: Firestopping, Bonding and Grounding, Codes versus Standards.
https://letstalkcabling.com/learn/
Knowledge is power! Visit our webpage to find out ways you can support the show. Also if you would like to be a guest on the show, please complete the application.
Chuck Bowser RCDD TECH
#CBRCDD #RCDD
Series Setup And Training Plug
SPEAKER_01Hey editing Chuck here, working on part two of the installation design series for access control and fire alarm service with Mick from Trican. I really enjoy working on this episode. Let me know down below if you like this kind of content. Should I do more of it? And also don't forget that we got our three CEC courses: Firestopping, Bonding and Grounding, Codes versus Standards. And we had a first class last night, Firestopping. Had a lot of people in that class. One person already mailed me this morning and said they were able to use some of the information they learned last night in their job today. So check down in the description for that. We'll give you the links for that as well. So let's get on with this very interesting conversation with Mick.
Battery Backup Planning And Limits
SPEAKER_01You have to factor in the access control panel design. Again, I've shown my naivety of access control systems. The size of the battery, the ventilation of the battery, is the battery stored inside the access control panel, or is it like phone systems where it's separate outside of it?
SPEAKER_00So it is generally inside the access control panel, and you will generally be limited to the size of batteries you can fit in the space that you have left. Some access control panels, people jam them so tight you can barely squeeze a 7 amp hour battery in them. And some of them have such a battery requirement, they have a whole separate can on their own. That's just batteries, right? Another enclosure completely dedicated to batteries. It all depends on, you know, what's what's your what's your client asking for? Are they asking for 24 hours of full battery backup? Um sometimes it's just four hours, right? They just need to be able to get through whatever they're getting through, shut down for the rest of the day, and still be able to get in. I think a general, at least for us, a general rule of thumb is we try to get you 24 hours uh of battery backup. Now, we there are scenarios where the batteries, you know, we could have extended outages. Um, but I would say the majority of all outages are going to be in the under 24 hour range.
Fire Alarm Failures And Fire Watch
SPEAKER_01Yeah, I think I would kind of agree with that somewhat. Um again, I know just tying back to my old fire department days, uh, we'd run calls all the time for you know fire alarms being set off. And um, and uh, you know, it was it was almost always a uh nine nine calls out of ten, it was a problem with the fire alarm system, right? But you have to treat every single one of them as if it's an act of fire.
SPEAKER_00100%.
SPEAKER_01And uh you would get there and and and you know it you never fail because it they it seemed like the fire alarm systems only knowed how to fail at two o'clock in the morning, right? And they don't they don't seem where to fail at two o'clock in the afternoon for some reason. And so so a lot of times, you know, it would they would fail, we'd go rushing out there, it'd be nothing. Of course, we still got to inspect the whole entire building, but but then you know, if we get a call at like 245, same building, same alarm, we go back out there again, again, you know, because you don't know. It could be something, you know, it could be burning. And we get there, and sure enough, it'd be a fire alarm issue. And then we get a call at 330, same thing. At some point, that building gets put on a fire watch, where you know, they they you know, somebody from I'm assuming like maybe if it was one of your systems, it'd be somebody from Trican, maybe. Um, where they come there and literally have to babysit the building until the right part came to fix the fire alarm.
SPEAKER_00Yep, yep. That is the thing.
SPEAKER_01It is, yeah. And that's where that's you know, people talk about fire watch, but they don't really know what it means. They you know, but there you go. I do,
Panel Craftsmanship And Labeling Rules
SPEAKER_01I do. So now let's shift our conversation to the to the technician, because uh, you know, a great design is a great design, but let's be let's be honest, it's the installer who makes it serviceable, right? So let's talk about the the panel, the panel itself, because you know, you know, I I've I I get the feeling, and you can correct me if I'm wrong, because I I you know I've I've functioned in many different social media groups, obviously. And I'm in the fire alarm social media group on Facebook, and and I'm at and I don't even know 99% of what I'm looking at, but but I will say I do get the feeling that technicians installing cabling in in access control panels and fire alarm panels are the same kind that doing structure cabling. There's those who really want to make sure everything looks nice and pretty, and then there's others who just like, yeah, whatever. Yeah, once the door closed, can't see it from my house. Right? Um, so let's talk about that control panel and let's talk about you know um maybe some best practices on on how to how to build that out. Sure.
SPEAKER_00Uh definitely I would say the number one thing I would say building your control panels is your labeling. You're labeling doors. Uh doors tend to switch names, they tend to switch purpose. What might have been the president's office today could be the storage closet tomorrow. Uh, room numbers, room numbers are sometimes lost completely, they don't exist anymore. You saw the change it was A102. Nobody ever called it A102 after that. So I there isn't really like the perfect way to name things, but I would definitely say it has to make sense to the people who are in the building because they're the ones who are gonna open that door up one day and try to like tell somebody what that meant. Um, so de but label, label, label. And I would go as far as to say when the banana cable comes inside the can, it should be labeled. And I use uh a numbering system that translate to the port that would it was plugged into. So I'll have the name of the controller, you know, CA, the name of the board three, and then the port dot one. So when you see that cable and it says CA3 dot one, you know exactly where it was going to.
SPEAKER_01You don't realize this, but you're labeling almost perfectly to the ANSI standards. Because really what we're supposed to do, structure cabling labeling. If you look at the the labeling standard, is so you see my rack behind me. So the patch panel that's in rack unit 45, which is the very top rack unit, so the cable terminal on the first port, that should be 45-01. Oh, okay. So you're labeling, you're following the 6S6 standard or the anzi standsy labeling standard. You don't even know it.
SPEAKER_00Didn't even know it.
SPEAKER_01That's right. So are you labeling both ends? So if if a if an end user, let's say they're looking at uh uh kind of go back to a door there for a second. Is there a label on the door mechanism that says, hey, this is you know, uh control panel three 3A-whatever you the whatever the sequence you gave is, is there a label on both sides?
SPEAKER_00So typically no, um, because when we do our K our cabling, we've usually peeled the Madana, peeled the banana already, and now we've split all the wires out to ever wherever they needed to go. So there's not really one spot. Uh, there are a few jobs where I used to take like a small sticker and put it on the inside of the jam of the door. Um and that that held up pretty well. Um eventually somebody's gonna paint over it. It's just the way it happens. Um, so we're not too strict with that. Usually with new installs, we we we try to do that. Um, but one day somebody is gonna paint it. I don't I don't care if it's a fire rated door they weren't supposed to paint it, it's gonna get painted.
SPEAKER_01Oh, absolutely. Absolutely. So, you know, we're talking about the cabling, you know, 184 and 226 and and and all that
Drip Loops And Smart Wire Routing
SPEAKER_01other stuff. They're not twisted pair, so you don't have to worry about untwisting the pairs. Do you have to worry about bend radiuses or is there anything else about the cabling that installers got to be careful with inside the access control panel?
SPEAKER_00No, not really. I mean, they're all stranded, so they they have a good bit of flexibility to them. Um, I would say make sure I I call it the drip loop. Make sure once you come into the can, give yourself that drip loop, go down to the bottom and come back up and then spider out to wherever you need to be on the board. Um, another thing I forgot when you do the labels, you know, you label the cable and it goes to the position that it's going in. But then on the other side of it, you have to have English. So you have to say CA 3.1 is the principal's office, right? And that's where things start to click and come together. That's where the English comes in and things make sense. And that's such a big deal because you look at all these things and they're, you know, you're looking at CA31, CA32, CA33, and you're like, who the heck? What the heck? I don't know where that is. I don't, you know, who came up with and you, you know, you're cursing the guy who came up with that uh labeling standard. It's it's gotta meet the English, right? That's how you really make a difference.
SPEAKER_01Until they realize that that number is the panel and the port number. And then by looking at the at the user side, when you and this is why it's written in the way it is in the standards, because that way when you look at that faceplate, in your mind as you as you read the label, your mind is envisioning exactly where that thing is. So when you walk into the room, you're not, you know, you're not in rack two, you're not at the bottom, because rack four unit 45 is the top, you know, you almost know exactly where that is before you even walk into the room or or open up the access control panel. Sure. Sure. So yeah, it doesn't make sense. I understand it doesn't make sense. And in this this is one of those hills I'll die standing on because you know, people in the industry that I want to label it by the room number. No, room numbers change. I want to label them one, two, three, four. Yeah, no. What have they if they add devices? Because you know, they're no longer in order, right? Yeah, there's lots, yeah, there's lots of reasons to do it the way that the standard says do it. No, you're talking about the cabling. So you say we got we got power coming over this cabling, we got some signal coming over this cabling because you're talking about the the door monitor, stuff like that. Um, should those cables be together or should they be separated in the access panel?
SPEAKER_00Uh they can be together. I mean, really and truly uh they're together the whole way, they're in the same banana, they're in the same jacket, right? Um, and the signaling is yeah, we have OSDP, which is a serial. Um but it is you said you're doing DC Current.
SPEAKER_01Yes. Well, DC Current doesn't have a sine wave to it, so it's just it's on. So there's there's no EMI you had to worry about. It's a stupid question. I just I answered my own question just thinking about it, you know.
SPEAKER_00Um so they could they can they can live in the same jacket, they can be right next to each other, and and 99% of the time they are right next to each other. If you look at the terminals, they usually group terminals uh four-door. So you'll have the reader, the rex, the DPS, all of those would be, you know, within a few inches of each other, all those connections, all those terminal blocks will be right there. Um, so they're gonna live with each other.
SPEAKER_01So you're talking about you know DC current going into stuff. Um, we're talking about the battery, stuff like that.
Ventilation And Heat Considerations
SPEAKER_01Tip number six would be think about the heat and the ventilation. I don't recall, because I never really paid attention, access control panels having louvers in them or not. Um, is this something that you gotta worry about? Because I know you know, any cable when you put the heat on it, it attenuates and causes problems. I know, I know computer controlled devices, CPUs, GPUs, when they heat up, they actually fail earlier. It's called the half-life rule. So think about heating and ventilation is what would that how would that come about with for access control systems?
SPEAKER_00Sure. So yes, they are ventilated. Um if you're buying a commercial off-the-shelf uh power supply, it's going to be ventilated already, right? So it's already kind of specced out. And if you buy the bigger build-it-yourself kits, they come with good ventilation already. Um, I think you'd be careful if you were to build your own enclosure. Maybe you started getting into the NEMA enclosures. You need to start building into, you know, maybe thinking about adding a fan to it or something like that. Um that you would definitely be careful. But I would say most commercially available power supplies and enclosures that are built for access control that are you know spec'd out, they're going to be already ventilated. Some of them have, you know, louvers, some of them have uh, you know, the tiny perforation holes in the door. So they they do come that way. I and they're generally, I've haven't opened up any commercial ones that you know, you know, when you open it, you get that wave of heat that like this thing just really needed to breathe. They're usually pretty good.
SPEAKER_01You're really good, Mick, because I I as you were talking, I was like, oh, go ask about that, and then you answered it. And then you're talking about asking about that, and you answer, get out of my head because you're answering my question before I ask them. Uh all right, tip number seven, make everything serviceable. Like I kind of touched base on, you know, um, and you kind of touch base a little bit because you're talking about doing the loop. Yeah, you call it the drip loop, and it actually is called a drip loop, but a drip loop's its origins is cable TV, like a network, a drop coming into the house. You do the drip loop so water doesn't file have a straight line into the house. But technically it is a it is a drip loop, right? Um, so give us some tips on making everything serviceable. So when the service tech, the fire alarm tech goes back you know, six months to service it, makes our job a little bit easier.
SPEAKER_00Yeah, definitely. I would say when you're in there, you know, you got everything labeled, you did your drip loop, right? And then you try to bunch things up with Velcro, bunch them up as close as you can to the splitting point, I'll say, where they net now they need to go in different directions. Because that really like keeps your eye focused on where those cables are. And as the technician who is always coming after somebody else, it really makes a difference because I take a lot of time in trying to decompose this mess of wires and try to put everything back together as best as I can. And you also have to keep in mind that you know, don't do a diagonal straight line to where you need across all the panel, across the whole panel. Because you really you you've gotta admit that the access control industry changes rapidly, and you may switch to a completely different access control system in a few years, or even better, the company that you're with has a newer version that you have to switch to, and it happens. I'll tell you now, uh, there's a company that uh warranties all their panels. Well, one of the panels died, so what do they do? They sent you the new model. Guess what? The new model is in a different spot. So all those like wires that you just strung really tight across diagonally that you have no room for, you got to do it again. Hence the drip loop, hence the drip loop, and hence making yourself give yourself a routing space, right? Don't move in diagonals, go down, around, up, whatever you need to do, but but move in a square to get to where you need to be. That way you can keep everything neat and tidy and off to the side.
SPEAKER_01And here's a chuck rule for you. Don't install that cabling like I don't care what it looks like after I close the door. Install the cabling like, hey, I'm gonna be the service tech coming out here in six months to fix this.
SPEAKER_00That's that's the golden rule because the the the the unlucky guy who's gonna fix it is most likely going to be you.
SPEAKER_01It always starts always turns out that way, doesn't it? It's a Friday afternoon, and you're like, it's 4 30, and you think, oh my god, I gotta I gotta deal with all that traffic on 295. And you know, I'll just I'll do this one little shortcut just so I can get out of a tiny bit earlier. And then sure enough, like the Monday after the weekend, you're going back or to do something else, and that shortcut that you took is causing you more time on a Monday. Ask me how I know that one. I'm not gonna tell you the actual story, but yeah, it that's happened to me on more than one occasion.
Expansion Planning And Growth Reality
SPEAKER_01You know, within a structure cable, we always talk about future proofing, you know, designing for tomorrow, you know, because you know, things change and you're always adding drops, stuff like that. Um, I I would have to imagine tip number eight, because you because you just mentioned that you know this, your your industry changes pretty fast as well, too, that you have to leave some kind of capacity for expansion.
SPEAKER_00So that's a it's a really good question, and it kind of depends. Sometimes there's access control is expensive, right? So saying I'm gonna put two extra door controllers in here just to get you ready could really drive up the cost in terms of, you know, maybe this is not a good project for this person anymore. It's out of their budget. Uh, I would definitely say um if you needed two doors, I'd probably want to make sure you had four just in case. Um, but I that's not to say that every project is has that kind of wiggle room, you're right. You have to talk to the customer to see where they're at. If they have, you know, sometimes you talk to them and they've already planned four extra doors, right? So in that case, you definitely at least want to have an enclosure big enough to add those extra doors to it. At the minimum, have an enclosure big enough because that's it's always a conversation, right? And if the conversation gives you the feeling that this person needs more doors, you want to account for that. Um, you definitely want to say, like, if somebody needed three doors, I probably, you know, controllers usually come in the one, two, or four range. If you needed three, I'm probably gonna go for the four for you rather than get you a two and a one and lock you in. Right. That's it.
SPEAKER_01I I would have to imagine that that would also depend on two factors. Number one, the vertical market that you're working with. Because you you um you're putting you know these systems in, you know, doctors' offices, commercial office buildings, hospitals, gyms, and a and a bunch of other places. So I'd imagine there are certain types of verticals that you just know just from all your years of experience, it's best to maybe have instead of doing three, doing six, and otherwise, where you might say where four would be. So I'm sure you probably got that good feel for that. Uh as a as a general rule of thumb, though, what percentage would you say? Would you would you say it's a 50% growth factor, 100% growth factor? Again, not tying into any verticals though.
SPEAKER_00You know, it's interesting because once somebody gets access control and they really leverage the power of being able to fully uh control the ins and outs of the building, who's got it, when they, you know, person got fired, I took it away instantly. When they really start to feel the power of the access control system, it they usually expand, right? It always starts off, I just need one or two. And then they realize wouldn't it be really nice if I had more? Um, so it's always one of those things where I feel like probably 60% of the time the system will grow.
Label Tools Battery Dates Sharpies
SPEAKER_01Gotcha. Tip number nine label everything. We've got talked that about a little bit already. Uh, you and I both are big proponents on labeling, labeling everything, and labeling accurately. We're big fans of that. So we already knocked that one to death. But let's talk about what kind of labels are you using? Are you using, you know, brother P Touch labels? Are you using cable wraparound cloth labels? What kind of labels are you using to label everything?
SPEAKER_00I I'm an Epson guy. I really like the Epson. Um I probably have one in every vehicle, so everybody's got an Epson. Um, and I teach all my guys on the Epson. And so we're using cable wraps to every cable that's in the enclosure has got a cable wrap on it. We're using, you know, just regular generals to I use the inside of the door. So all of the the names of all of the devices, all the those English names, that's on the inside of the door. Uh the exterior of the cans, that is also labeled with a node number. So whatever the node is, that's the node for that can. Uh, the batteries, you must label the install date on the battery.
SPEAKER_01Why is the date important?
SPEAKER_00Batteries don't last forever. When you get to about five years, you're lucky and you should have replaced it already.
SPEAKER_01Oh, wow.
SPEAKER_00So when I walk in there and I see a 2008 battery, I can already tell. Tell you right now, we're getting rid of those, we're throwing them away, we don't trust them, and you're getting new batteries. Um, and then even for our own sake, when we walk in and maybe it was my install, and maybe I lapsed and I I forgot, you know, when the last time I put those batteries in. I need to know that. I need to know when these batteries went into service because there's a there's an expiration date. So we always put the date it was installed, not the date of the expiration. So we put it and we put it down to the day. Now, I don't know if it really mattered, but I like to know the day that it was it was put in. It gives me a little bit of context too. Uh it starts to be a memory jogger of, oh, yeah, yeah, yeah. I remember that. August 10th.
SPEAKER_01That's a great value add, too. While you're there doing the service work, you can tell your customer, look, I just haven't noticed your batteries are five years old. They generally last three years. You've been, you know, you two years, you've been pretty stinking lucky.
SPEAKER_02Yeah.
SPEAKER_01And and when you think about the cost of replacing a a battery in a panel system, I gotta imagine. You can tell me if I'm right or wrong. You I gotta imagine it. It's far cheaper to do it while you're there already doing a service call, as opposed to a 6 30 p.m. on a Friday night service call because hey, we're trying to trying to turn on our alarm system, it's not coming on, and then you got to dispatch a tech from uh from Hagerstown, Maryland.
SPEAKER_00Oh, a hundred percent. I mean, getting it done while you're there is the name of the game, right? That's gonna save everybody. Um, you know, I like service calls, but I'd rather not send a tech all the way out somewhere just to swap two batteries and come back. Um, it's just well, not one of those, it's just I'd rather not. I there's so much more important things to be doing. Not to say batteries are not important, but a little bit more challenging important things to do.
SPEAKER_01But if that's a foundational thing, that it should be done right the first time, every time, and it should even be in question, though. Other things, other things, there's different levels of factors that go into that. So you know you're talking, you're talking about so again, you're following this the NC standards on labeling because it says you're supposed to use machine-generated labels. So you see, you're following the standards you don't even know it. Um, and they say that you're not supposed to use sharpies. Do you ever see, you know, I know it's not you or anybody, any member of your team, but maybe an install done by somebody else where they labeled everything by Sharpies?
SPEAKER_00Yes, all the time. All the time. And I'm not saying that every time sometimes that Sharpie has saved the day. Because I'd go to a battery and I'd see a very faint, shiny uh, you know, 7 2025, and I can say, okay, well, that's better than no date at all. Um, but you know, you always love to see the nice label on it because Sharpie, you know, it sometimes it smudges. It it has happened.
SPEAKER_01And it's a sign of professionalism when you're using a machine generated label. Correct. And and I hate to admit this, not everybody's handwriting's the best. No. Sometimes I can't even read my own handwriting, and that should tell you something right there.
SPEAKER_00If you've ever seen somebody try to write on a 22-2 cable that's about this thin.
SPEAKER_01Yes.
SPEAKER_00And try to write a label on it that's legible. Right. I'd pay money to see that.
SPEAKER_01I was just telling somebody this just the other day. It might have been my wife, because she's helps she helps with the podcast now. We're talking about labeling and stuff like that. And and I said, you know, the Sharpie's aren't the best, I aren't aren't even a great idea for roughing because, you know, but look, you know, six and nine are identical to each other unless you put a line under one of them to let you know which is the bottom of that number, right? And and you tie in sloppy handwriting, and you tie in the cable getting pulled through conduit and getting smudged and smeared, or through the ceiling gets smudged and smeared, and you can't read them, it comes out the other side. So I'm I'm a super big huge fan on labeling everything and labeling everything the correct way. All right, pro tip number 10. Pro tip number 10.
Documentation As Builts And Asset Lists
SPEAKER_01Documentation. Closing out the project. One of the one of the most areas where uh I I again I can't speak for access control, but I can speak for structured cabling professionals. We suck at it. We're great at putting in the cable, we're great at testing the cable. We're just we just forget to put that dot at the end of the sentence, and that dot is called the documentation. So let's talk about some of the documentation that's that's done with with access controls. So what kind of what are some of the requirements that you see uh that require that are required in the document package?
SPEAKER_00Yeah, so definitely I would say an as built is money. So that's for us, it's taking you know uh a layout of the plans, putting our door labeling scheme on the plans so that somebody can see exactly what CA 3.1 correlates to on the map, right? So when you put it on the plans, that's that just changes everything. And then you fold that up and you stick it inside the uh, I mean, you email it to the client as well, but you stick it inside the enclosures that way. That next guy who comes in, he can just open this thing up and say, Oh, it's all here, right? I mean, that that just gives you that warm, fuzzy feeling.
SPEAKER_01He opens it up and says, Oh, this must be a trican job. Yeah. Um see, in our world, the structure cabling world, again, you mentioned you send a copy to the customer. We send a copy of the Asbuild to the customer as well, too. And then and as a project manager, I always told my when we finish a project, print off three sets of prints. One for the customer, one for the R office, because the customer always loses their prints. And then the third one is laminate it and mount it to the wall. So that way when the service text there, they know exactly. But you're folding yours up, putting it inside the control panel, and the control panel is locked, so you don't have to laminate yours. Yeah, that makes yours even even in safer. What other kind of things um would you would you make part of the documentation package?
SPEAKER_00So also the equipment that was installed, right? So it's good to know. Um, and it and this is good when you get to like maintenance and service, right? What what model readers are on the wall, right? If I have to go over there and heat the customer tells me, hey, this one died. Well, I need to know which one I'm bringing to replace it with. Yeah, I I may remember, but I'd like to have an equipment list. So I keep a uh a list of all the readers that went in. What are the control panels that went in? Um, a lot of times we'll document the network equipment. So the control panels a lot of times are on the network. So we'll document the MAC address, the IP address it was using if it was a static, um, serial numbers of devices, um models for the power supplies, uh, the amount and models for the batteries that we put in. I don't think the brand matters as much as the size of the battery. So if it was, you know, 12 volts, 7 amp hours, I could look at the documentation and say, okay, this guy needs new batteries. He had two 7 amp hours, load that on the truck and go and go out. So that information is on there. Uh the models of the power supplies are on there. Um, the models of the lock, the locking hardware are on there. So we know exactly, you know, if a if a strike is dead. You know, sometimes they can send me a picture and I know, oh yeah, I know what that, I know that model number. But sometimes they I'm not there, somebody else is there. That's fine. We have the documentation, we'll look it up.
SPEAKER_01Right. So a couple final questions, and these weren't in the in the list that I sent over for you, but I know you're a true professional and you can handle them with ease.
Codes Life Safety And Certification
SPEAKER_01So I already mentioned you're following Nancy labeling standards. So what standards or codes do you have to follow as an access control or a fire alarm installer that maybe a structured cabling guy doesn't?
SPEAKER_00Building code comes into play. So the IBC comes into play, and that's based on the jurisdiction. Um, so building code comes into play, uh, NFPA 101 comes into play, so that's the life safety code. And these are all important whenever you talk about like egress doors, right? There are rules on specifically maglocks because of the way that they work, right? They're either on or they're off, and there's no other way to get through them unless you turn them off. Well, there's the axe, but um so those get very tricky when it comes to you know what you have to do to make that safe in terms of you know the mechanical interrupt of the circuit, uh the rex device, how that rex device is wired into the circuit, the circuits matter. Um, so those kind of things, the fire alarm interface. So I would say between the IBC and FPA 101, uh, so the structured guys will still be governed by NEC. So I think we're both governed by NEC. So that's not a different or different way of doing it, but definitely IBC. IBC is gonna give you uh stairwell re-entry, all that other stuff. So there's a lot of life safety when it comes to access control. So those two things probably come in the most.
SPEAKER_01It's a little bit more critical. Yeah, it's life safety. You know, it's funny. You mentioned the axe again. You know what we used to call an axe in the fire department? Key to the U-2, an Udo, U2, universal door opener. Get the Udo. Okay, we'll be right there because it would open up any door. It works, it definitely works. Yes, it does. So let's talk about, you know, you I obviously there's more than one manufacturer of fire alarm systems, access control systems, stuff like that. Um is it is it similar to the structure cabling world? There's a there's a there's a uh a Belden, a Panda with a Levitin, and you get training, you can get training from those different manufacturers, you can get certified from different manufacturers. Is that same kind of thing true in the access control panel?
SPEAKER_00Oh, 100%. So it's it's it's the same way, a little a little bit tighter. Uh when it comes to an access control system, you you can most of these companies have certification training to get you certified to just install it. There's uh dealer, the dealer side of certification as well. They don't allow anybody to just install um some companies do, but they're you know, when it comes to what we call the heavier irons, like the bigger brands, you can't just say hell we call we call it like the big four, right, in our industry.
SPEAKER_01And you could probably name the four structured cabling manufacturers I'm talking about. I say the big four. Yeah, it wouldn't it wouldn't be you know high olasi cable from Amazon.
SPEAKER_00They're not one right, right, right. You're not just gonna wake up one day and say, I'm gonna install Comscope, right?
SPEAKER_01No, no, that's that's a process to get in. It's a process, like any of the big four, right? There, you know, you you there's a there's a whole process for it. You gotta apply for it, you gotta prove that you're worthwhile to be in the program. You got you might have to get training or certified. There's lots of but you don't you don't just get accepted, those big four. That's that's why it cracks me up. You know, you see the comments all the time. Again, in the social media groups, you know, well, I don't have to be manufacturer certified. No, you don't, but uh, you if you are manufacturer certified, you are you anything you do is covered under the extended warranties, you know, which is above and beyond what you would get from a standard, you know, 12-month warranty, six month warranty, whatever the case may be. Sure. Vic, what a great conversation, man. I appreciate you coming on. I didn't realize we went an hour. Dong Arthur probably break this up into two segments. So appreciate you coming on and sharing your knowledge, my friend.
SPEAKER_00Oh, anytime. Whenever you want to do this, I'm down. I I'll put I'll make a new bucket list. And there you go. I got one more question for you.
SPEAKER_01I just thought of this. I just thought of this. So, you know, getting in the structure cabling world, you can you can get in pretty easy. Just find a place that's hiring apprentices, get there, show up every day, listen to what they tell you to do, stay off your phone, you know, be a good worker, and you'll work your way through the ranks. And you might get you might get training, you might get pixie training or something like that. But in the in this in the access control world, or is it the fire alarm world? I don't remember which. You hear people talk about nyset. What is nyset? And do you have to have that training or certification to be able to even install access control, fire alarm stuff?
SPEAKER_00No, you don't. There is a NISAT for like security and access control. It's not very common out there. I don't think people, it's it nice set is like the gold standard when it comes to fire alarm. Okay, they want to get into more of the security, they're not there yet. It's not like like I could go in and read a spec for a job, and it's like if you don't have a nice at three, you can't design fire alarms. So it's kind of like Bixie.
SPEAKER_01It's kind of like Bixie.
SPEAKER_00Yeah, yeah, yeah.
SPEAKER_01You can you can you can install terminated test cable without being Bixie certified or FOA certified or CFOT certified. But there's projects that come out where the customer says in order to bid on this project, you have to have X amount of NISAT 3 installers or NISAT. Yes. Okay. For some reason I had in my head that uh when it came to NISAT, that that was a a code required kind of thing just to be able to install the system.
SPEAKER_00So now I will say this New York specifically has in their requirements nice at so if you want to touch fire in New York, it's a nice set. I know most other jurisdictions. Now I know New York specifically says nice at, but in most other places, a nice set satisfies all requirements. I mean, I have a nice set as well in fire, I just don't like fire.
SPEAKER_01Gotcha.
SPEAKER_00So I guess it would be good advice.
SPEAKER_01It would be good advice that uh get your nice at certification. Or no, no, no, no. It would be good, it would be good advice to check with your local authority having jurisdiction as to the requirements for nice at and also check with your customer and the contract verbiage as to whether or not NISAT's required.
SPEAKER_00Is that that's a more yeah, and nice at I honestly, NYSET is bigger in the fire world than it is in access control. I don't think I've ever seen anybody mention NISAT in a spec for an access control. Honestly, most people don't spec. They only spec that you have been certified on that specific brand. So you need, like let's say it's Hirsch. You would have to have a Hersch identic certified tech on staff to bid the project.
People on this episode
Podcasts we love
Check out these other fine podcasts recommended by us, not an algorithm.
The Cabling Podcast
Cabling Installation & Maintenance
49 Volts Podcast
Josh Bowman
TKW TekTalks
TeKnowledge World Wide
Low Voltage Nation Podcast
Low Voltage Nation Podcast
The Low-Voltage Lowdown
trueCABLE