Let's Talk Cabling!
Welcome to "Let's Talk Cabling" – the award-winning podcast that's your ultimate gateway to the dynamic world of information and communications technology (ICT). If you're aged 18 to 40 and thrive in the ICT industry or simply curious about it, this podcast is your must-listen destination!
🏆 Award-Winning Excellence: "Let's Talk Cabling" is proud to have earned recognition for its outstanding content and invaluable insights in the ICT field. Our commitment to educating and empowering individuals like you has garnered us a prestigious industry award, a testament to the quality of information you'll find here.
🌐 Explore the ICT Universe: Join us as we delve deep into the realm of designing, installing, certifying, estimating, and project managing low voltage projects across diverse industries. Whether you're an industry veteran or just starting your journey, our engaging discussions will enrich your knowledge and skills.
🎙️ Story-Driven Learning: We follow the captivating StoryBrand methodology to ensure every episode is not just informative but also captivating. Expect real-world anecdotes, expert interviews, and relatable narratives that make learning about cabling and ICT a fascinating experience.
🚀 Subscribe Today: Don't miss out on the power of knowledge! Hit that subscribe button and embark on an exciting journey with "Let's Talk Cabling." Whether you're on YouTube, TikTok, LinkedIn, Instagram, or your preferred podcast platform, we're here to educate, encourage, and enrich your ICT endeavors. Remember, in the world of ICT, knowledge is power, and we're here to empower you.
Join our growing community of ICT enthusiasts today!
#cbrcdd #rcdd #wiremonkey #BICSI
Let's Talk Cabling!
AHL: Telecom Project Management Toolkit
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
We move fast through the real-world questions that decide whether an ICT job runs smoothly or spirals into rework, delays, and budget surprises. We share practical field habits for project management, safety, grounding, and closeout that help crews finish clean and keep customers happy.
• acronym challenge and a retrofit versus new construction preference
• fiber optic cable manufacturing growth tied to data center expansion
• upcoming shows, travel, meetups, and training options
• difference between design project manager and telecommunications project manager responsibilities
• what goes into a submittal, why approvals matter, and how shop drawings fit
• SWOT analysis basics and internal versus external factors
• cost performance index (CPI) as a budget health signal and why context matters
• raised access floor hazards in data centers and how to secure the work area
• improving interpersonal skills through active listening, clear writing, and sharing bad news
• best practices for bonding racks, TEBC routing, compression lugs, and prep steps
• arc welder EMI separation distances and why interference matters
• what a star washer does for bonding reliability
• housekeeping closeout steps that leave the site better than found
go to let's talkcabling.com forward slash ask dash chuck dash live, and sign up to become a member
Knowledge is power! Visit our webpage to find out ways you can support the show. Also if you would like to be a guest on the show, please complete the application.
Chuck Bowser RCDD TECH
#CBRCDD #RCDD
Kickoff, Acronym, And Crew Poll
SPEAKER_00Wednesday Monday night. Whoops. I've said Wednesday night so many times I've messed up. Monday night, 6 p.m. Eastern Standard Time. That can only mean one thing. Live after hours with your favorite RCDD. You know it's me. You know I'm your favorite RCD. So there we go. I got a collection of questions for you, some announcements, some news to report. Got lots and lots of stuff to talk about this week. First off, let's start off with uh the acronym challenge. The acronym challenge, ready? Here we go. P A B X. P A B X. What does that acronym mean? P A B X looking for that acronym. Alrighty. Fifteen seconds left. Type in your response. P A B X. In five seconds. Alrighty. Nobody even guessed it. Wow. Private automatic branch exchange. There you go. Oh, you know, I've replaced the what are you drinking thing. So here's a new here's our question for this week. Tell us, would you rather do retrofit or new construction? Would you rather do retrofit or new construction? Tell me that in the chat box. Retrofit or new construction. And uh you know, uh me, I'd rather do new construction. Retrofits are fine. Um but it's always more of a challenge working around people, right around desks. People tend to complain when you're uh when you are you know leaving dust on their desks and you're getting in their way. Anthony's in the house! What's happening, Anthony? All right, what's new in the what's new in the industry this week?
Data Center Boom Industry Updates
SPEAKER_00Got three stories. Three stories. Here's the first one. Let me flip back over to it there. U.S. fiber optic cable construction progresses alongside data centers. This is in uh the October 16th edition of Industrial Info Resources. With all the attention of new data centers being built across the country, here's something worth talking about. The manufacturers' facilities producing all that fiber. Industrial Info Resources reports that the U.S. fiber optic cable manufacturers are expanding alongside growing the data center demand. So, yes, they're adding to their capacities, extra shifts, adding new manufacturers. These facilities use miles of fiber, and manufacturers are working to keep pace with construction. For structure cable, I can't talk. For structured cabling professionals, there's an important part of the bigger picture. We often talk about how the infrastructure is going into data centers. But what about the manufacturing capacity needed display? You know, I just talked about this. We talked about uh uh an episode coming up soon with uh with Sean from Light Brigade, talking about all the data. Another one with um um a guy from oh can't think of it, stickers. TJ's in the house. Sticklers talk about how the impact of data centers even impacting them. Second story, the TIA releases the first draft of the DSE 9000 as the data industry faces growing quality and reliability demands amidst amid unprecedented unprecedented investment. Yes, so I'm not gonna bother trying to do that one. So lots of stuff. And then the third one is Anfinal to showcase a new data center interconnect technologies at Optica PECC summit in 2026. So watch for that story come up. I'll put those links down below.
Events, Courses, And Patreon Access
SPEAKER_00Down below. Um last week we did the first part of the access control panel show. The second part airs this week. Uh, don't forget this Friday, I'm leaving Friday, but Saturday, Texgiving, Philadelphia, Ronald McDonald House, yours truly will be there helping with the cabling. Um also got coming up the cold weather survival and fiber made simple. Okay, so we've got lots of good shows coming up. Lots of good shows coming up. Of course, we also just did this last week our monthly Ask Chuck Let's Talk Cabling Crew Zoom call. So if you're a Patreon member, if you go to let's talkcabling.com forward slash ask dash chuck dash live, and sign up to become a member, you get to participate in those Zoom calls. Any questions, any questions. Um, also don't forget we got those three recognized courses for CEC's Firestopping, which unfortunately the registration closed yesterday, but a new one will be offered again in March. I got one on bonding and grounding on November 17th, and codes and standards January 19th. And make sure you keep your eyes peeled for the new study group coming out as
Design PM Vs Telecom PM
SPEAKER_00well. Question number one. This comes from Jason Miller on LinkedIn, and he has four years of experience. He says, What is the biggest difference between a design project manager and a telecommunications project manager? Where does one person's responsibility end and the others begin? See, that's actually a great question. A great question. Because there's two types of project managers. There's regular project managers, and then there's telecommunications project managers. And while most people think they're the same, they're similar, but they're not quite the same. The biggest difference is a design project manager, and this might be a cut a project manager that actually works for the customer, they're gonna handle the planning, the design, and the bidding preparation, while the telecommunications project manager is gonna be more focused on how to get that project implemented, how to win that project, price that project, execute that project. See the design project manager, they start by reviewing, you know, what is it that the company needs? How much bandwidth do they need? Do they need what kind of computers are they gonna be putting? What kind of servers, switches? And then that they may create that analysis. And from there they start conducting site surveys, meeting with you know the IT department and preparing those preliminary submittals. Then they're also gonna respond to them with the final bid docs, sometimes known as the RFPs or the engineer's cost assessment. From there, what's gonna happen is the telecommunications project manager is gonna pick it up, they're going to respond to that RFP, they're gonna verify the design, see if there's any holes in it, and there's always holes in it. Always holes in it. And then they're going to bid the project. If they win a project, they're gonna execute it, they're gonna make sure that if it gets under schedule and make sure it comes in under labor budget, under material budget, with a functioning ICT system and also a happy customer. Happy customer. I did see a couple questions pop in here on TikTok. Let's hit those real quick. Chuck, what is my opinion on putting fiber, putting the fiber splice shelf one, the color code order in the trays? What's my opinion on putting the fiber splice shelf? Oh, splice sleeves. Oh, sorry, so red shelves. Uh the color code order in a trace. Well, you and I have talked about this, TJ, before, because we've talked about you know what happens if it's a 16-strand configuration for like MTPs, something like that. That kind of really messes you up, doesn't it? Um, my opinion is follow what the Zanzi Standard says or what the customer specification says. That's that's gonna be the key thing. Chuck, you're doing a meet and greet. Do you know any conferences in the mid-Atlantic? Well, define the Mid-Atlantic. I just did a meet and greet in Tampa, Florida last week on Tuesday. Tuesday. And I do have some trips scheduled to depends on what you define is the Mid-Atlantic. You know, I will be uh in the Raleigh Durham areas later in the year. If you consider the Mid-Atlantic the DC area, I'll be there in springtime. So I might do a meetup there. You've got to tell me where you're at, Chris, so I can tell you when or where that's going to happen. Question
Submittals That Prevent Costly Rework
SPEAKER_00number two. This comes from Tyler on Facebook. Okay. Um sorry, our project has been up and waiting on submittal approvals. It's been held up on submittal approvals. Gotcha. What exactly goes into a submittal and why is it so important to get everything approved before we get started? Kalen's in the house. Kalen, yes, we shifted it to Monday nights. Monday nights, remember that. So submittals basically are just a way for the contractor to communicate to the customers, the owner, exactly how the work will be performed, and more importantly, what types of products are going to be used. They're also going to be used as part of the QA process to help make sure that the proposed work actually complies with what the contract documents actually say, because that's a big one. How many times have we done work that wasn't in the contract documents? If you did, if you say yes to that, you you did something wrong. Right? You did something wrong. And here's why it's mattered, because if the contract installs something before they get approval, there's a good possibility you might have to remove that product, replace that product because the the submittal has not been approved. Because the customer might come back and say, yeah, we don't want those. We want the fuchsia color jacks, not the ivory color jacks. And you've already started determining Fusure color jacks, well, there you go. That's you have to replace all those. But when you're talking about construction, submittals are going to generally be uh consist of two main components, shop drawings and manufacturer's product data sheets. Now the good news, or sometimes even certificates. The good news, the second and the third one are easy to get, right? If you're already, you know, if you're already putting in a manufacturer's type of cable and connectors, guess what? They already got those sheets. All you got to do is just give them a call and say, hey, manufacturer, send me those documents and they will send them to you. Okay? You don't have to create those. Now you do have to organize them. You might have to make copies of them. You might have to put them in a binder, right? And then the shop drawings are gonna be a little bit more difficult because shop drawings, what they're going to do is they're gonna specify the details of the installation, including how those components that they got from the manufacturer specs, how they're gonna be interconnected, how they're gonna be routed, and how they're gonna be used for installs. And then when you wrap in on another layer of difficulty here, is if you wrap in specialty contractors, including like AV installers, access control installers, now they're they're they're gonna be among people usually help provide those shop drawings, but the thing is, is in your larger projects, they may not be used to doing that. May not be used to doing that. But the key takeaway is that the submittals aren't just paperwork. It's an important part of making sure that your project, your design is gonna be meet the customer's requirements that's in the contract documentations. Because if you don't follow the contract documentations, you will be having to replace them. Question number three.
SWOT Thinking For Better Decisions
SPEAKER_00This comes from Amanda on Instagram. My supervisor asked me to put together a SWOT analysis. That's that's an acronym in case you didn't know that. S W O T SWOT analysis. I understand it stands for strengths, weaknesses, opportunities, and threats. But what's the difference between internal and external factors? Okay, so you know, I just talked to somebody the other day. Um, they were asking me some uh some advice on something on what to do with a career or something, maybe, and I even told them to say create a SWOT analysis for it. So that way it helps make that decision a little easy because you get hung up in those little things. A SWOT analysis, just that you just draw a square and you put a line horizontally, a line vertically. You end up with four boxes, four sections, and that helps you look at one of those boxes is the strengths, okay? The strengths. Keith is in the house. Um, and that's where you're gonna list all of the internal positive factors for that project. The weaknesses are gonna be the negative internal factors that could affect the project. So maybe, like for example, the submittals weren't approved yet, or the person who's gonna be the internal contact hasn't been identified by the customer yet. That would be a weakness. Opportunities are positive external factors that could benefit the project. So, for example, you might say, okay, well, nobody has thought about thought about putting in the lightning protection system. That's an opportunity because that might be potential change order. And then threats, threats are negative external factors that could create challenges. So when you list them all out, you can look at that SWOT analysis and it gives you an organized way to look at all that stuff while reviewing the factors of the project or any kind of decision. This doesn't have to be a project. This could even be used if you're trying to decide a career path, a career change. This could also be used for that as well. It's not just for project management.
CPI Budget Tracking With Context
SPEAKER_00Question number four, Marcus Reed. He's a little old, he's project manager with seven years of experience. Says, how can I use the cost performance index, the CPI, to tell me if my project's staying on budget and is a higher CPI? Oh, he's a good thing. Well, first off, let's start talking about what a CPI is. A lot of project management questions right out of the gate here today. So CPI cost performance index, it just measures how efficiently that project is using the budget resource because every estimate is a budget. Is a budget. Thank you, Keith. I appreciate that. I love having network engineers come on. Uh we talked specifically just layer one stuff because I don't know the other layers because I'm just an old wire monkey. But I appreciate you coming on, Keith. Um, so the the CPI, it helps you determine whether your project is over budget or under budget at any point during the project. And trust me, if you're over budget and it's early in a project, you've got lots of time to fix that and maybe still bring the project in under budget. If you're if you're you know halfway through the project and you're on and you're under the budget, you're rocking and rolling, you're gonna come away with a good project you know dividend on that. So CPI is a great way. A great way. The key to remember is the higher the CPI, the better it is. The lower the CPI, the worse it is. So for example, when you start talking about CPIs, generally, most projects, if the running is executed, they're gonna fluctuate between 0.95 and 1.05. Now, anything above 1.0 might sound good because that does indicate that you're you you got some money left in your budget, but there's always something to watch out for. How many times have you been on a project where you've had good CPI and then all of a sudden you discovered, oops, they forgot the redundant fiber optic backbone cable. Now your CPI is going to drop down because now you've got to start doing all the additional work. That's why you shouldn't always just look at whether or not your CPI is high or CPI is low. You need to understand what might be causing that number. Why is it causing it to be high? Why is it causing it to be low? That is where the good project manager earns their weight. Earns their weight. And the key takeaway is even a fee, even a favorable CPI could also be a warning that something could be going wrong and causing you all kinds of problems.
Raised Floor Safety In Data Centers
SPEAKER_00Question number five. This comes from David Harris. He's a low voltage safety officer with 12 years of experience. He goes, I'm responsible for keeping our crew safe on job sites. And we're going to be working around access flooring in a data center. What are some of the biggest hazards I need to make sure that everybody feels, everybody understands before they start moving, removing floor tiles? Now, I did I I think I did a answer a question similar to this a couple weeks back. But you know what? This is important. And Keith will tell you, Keith is a network engineer, if he's ever worked in a data center, access flooring, while it may sound like a great environment, it is rife with hazards. Lots of types of hazards when working with access flooring. Okay. So whenever you remove a floor, you need to make sure that you secure your work area. If you ever sat in any Bixie class, they always tell you, secure your work area. Caution tape, cones, ladders, apprentices, spools of cable, boxes of cables. Secure that work area. So that way people don't accidentally walk into the uh into the uh into the hole that you just created. WireMonkey in Arizona says cones are a friend in and raised floors. Absolutely they are. Absolutely they are. Um if you have to bring any kind of heavy equipment, right, across that room, across that access flooring, make sure you catch base with the contractor installing the access flooring to find out what is the load specifications. Because if you bring in like a big spool of, let's say, I don't know, 900 pair cable and the spool that comes on, and you start causing damage, they're gonna start wanting to charge you for that. It's called back charge, and that's not something you want to hear. One another hazard is a lot of people don't think about access flooring, is that space underneath the floor is used to move air to keep equipment cold, right? So there's a pressure, there's positive pressure because it forces those that air to come up either in a perforate tile in front of the cabinets or actually in the holes cut out in the cabinets, and that kind of keeps that equipment cool and gives it fresh air. But what that means is to you as a technician is when you open up a floor tile, you're gonna get whoosh, a big blast of air in your face. And if you're not wearing safety glasses, you could get a potential, could get a potential uh eye injury. Now, K K-Man says confined spaces. The space underneath the floor is not an eye, and I consider it a confined space, because in order for it to be confined space, you have to be able to get into it. It has not to be designed for regular uh regular occupancy. And um remember the third one is there's a third third bullet makes something confined space. Access flo underneath access floor is not for you designed to go underneath of it. You you you lift the tiles, you drop the cable down, you close the tiles back up. So there you go. Um the stringers. Um make sure that you don't remove too many tiles at a time because that can weaken the struggle integrity of the actual stringers themselves. And make sure you pay attention. Put a piece of get some uh some painter's tape, put it on the each of the tiles and number them so that way when you put them back together, you know exactly where each tile goes. Where each tile goes. Okay, look up the three requirements for confined spaces and put it for me in the chat box. I know I got two of them. I just can't remember the third one. All right. Um, so watch out for that flooring. Okay, watch out for that flooring. I put the meows in the house now. Also, you know, the floor tiles sometimes even have arrows on them. So make sure you put them all facing the same direction. Okay, that's gonna be key. But yeah, it is it is a if they can become weak, they're a potential trip hazard, secure your work area, and uh make sure you put the tiles back exactly where they came from, you should be fine.
Interpersonal Skills That Move Work Forward
SPEAKER_00Question number six. This comes from Kevin. Kevin Mitchell, and uh he's a lead structure cabling technician, um, and he has five years experience. And Kevin wants to know my last before on my last performance evaluation, my supervisor told me I need to improve my interpersonal skills. Interpersonal skills. Hmm. That's uh that's always one of those uh one of those things that managers like to uh like to throw at us to try to confuse us. How many people tell me in the chat box? Tell me chat box, do you know what interpersonal skills are? Tell me in the chat box, do you know what is an interpersonal skill? Right? Um oh getting back to the confined space. Number one, you have to be able to get into it, like I said. Number two, you have to have a limited means of ingress and egress. And number three, it's not designed for for continuous occupancy. Those are the three components in order for it to be considered a confined space. So interpersonal skills, it's just they're just about how you communicate. Communicate. Communicate. It's funny. We work in the communications industry, and what do we suck at? We suck at communicating. We just do. We suck at communicating, and we work in the communications industry. So here's what you need to do to improve your interpersonal skills. You need to make sure that you're able to plan, organize, and communicate well with others. Okay, communicate. And there's even classes, your local community college has. Class you can take on interpersonal skills. But you can start off by being an active listener. And I struggle with this one because my ADHD brain, when somebody's telling me something, I'm thinking about three other things. Whoops, see, three other things, right? See you later, Mr. Kalen. Um, so one of the ways that you can prove that you're an active listener is number one, by taking notes. I'm always keeping a paper and notepad with me nearby. Uh, and I'm taking notes. And then also, I will sometimes even repeat back to the person, here's what I think that you said, and report it back to them. And that way they know that I'm listening, right? Um, respect values and traditions and the belief of others. There's not two people exactly the same in this industry. Some of us are old people like me, right? Who feels that you deserve, you have to you have to climb, you know, start at the bottom of the ladder and work your way up. There's other people who, you know, younger generations that say, okay, I'm gonna start at the middle. And there's nothing wrong with either one of those. Nothing wrong with either one of those, but you got to be willing to listen and understand that, right? That's what I'm always talking about. Always get things in writing. Yes, Keith. Pro tip number one on my on my uh on my list on my website, 147 um pro tips. Document, document, document. Yeah, that's gonna be important. Document, document. Document. We have a sneeze and it doesn't want to come out. Um then so make sure that you um communication is not just actually only just listening to, right? You gotta share that information. If you and even good news and bad news, because see what happens is when it's bad news, a lot of times is we tend to not share that information because we're nobody likes to get bad news. So we tend to not share that information, and that causes us problems. So you want to grow your interpersonal skills? Find ways to communicate good and bad news. Make sure it's clear, quick, and concise and unbiased. Those are the four rules that I follow when I write an email. You know, if I if I'm if I'm asking you for something, I'm gonna put that ask at the very first sentence, and then I'll give you the paragraph behind it to explain why I'm asking for that. Um because remember, interpersonal skills isn't just about talking more, it's about listening, communicating, and respecting other people. And that should help you. Question number seven. This comes
Bonding Racks And Clean Grounding
SPEAKER_00from Brian. He's a data center technician with three years of experience. What are some best practices I should follow when bonding equipment racks? Hmm, that's a great question. Um, you should have already been taught that if you didn't work in data centers. I want to make sure that I'm using the right connections and prepping everything properly. Okay, so there's a lot of thoughts about this. The newest, latest, greatest thought is run a bonding conductor from the bus bar to the furthest rack in the room and then attach it. Any racks in between that furthest bus bar and the furthest rack, you're gonna run a short jumper from that rack up and attach it to the by the way, that that conductor is called a TEBC telecommunications equipment bonding conductor. So you can run that short conductor up, you're gonna strip off the copper, you're gonna crimp it on with an irreversible compression style fitting, crimping it back facing towards the bus bar. Now, when you attach to the racks, you got a couple options here. A lot of your newer racks, for example, like my CPI rack over here, it's got studs on the inside of it, so you can attach your bondic conductor to it. But not all the racks have that. So you can use a two-hole lug, just like you're using for the bus bar. You may have to drill out two holes in the down rail of the rack, scratch paint off that rack.
unknownRight?
SPEAKER_00It's remember, it's got to be a listed compression two-hole lug connector. That's the key thing. Okay, it's got to be compression. Do not use split bolts. Scratch paint off that rack and use paint piercing washers. Paint piercing washers. Also use antioxidant too, because that way that helps reduce um oxidation. So that way that the body conductor stays good over a life spirit. Question number eight. Chris Martinez. Structure cabling with two years experience. We're running cables in a school that has a welding program. Excellent. Glad to see that. How far do our cables need to be dropped away from the arc welders? And why does that distance matter? Okay, so the if you look it up in the It's a manual, the Information Transport Systems Installations Methods Manual, 80 millimeters, or basically about 32 inches. 32 inches. And the reason for that separation is because arc welders put off a lot of electrical interference, electromagnetic interference, sometimes called EMI. Okay. And the the the distance, by the way, is gonna vary by the the type. John's in the house. Um 80 centimeters. What's 80 centimeters? No, 800. Sorry, 800 millimeters or 32 inches. Sorry, did I say that wrong? That happens sometimes. It happens. So the distances will change. For example, if you got a uh a transformer in the room, that distance is 48 inches. So the more the more energy, the further away it's gotta be. Okay, that's what that boils down to. Question number nine. Ethan from TikTok. I'm still learning about all the different hardware that we use. Exactly what is a star washer? What is a star washer? And what's the purpose of those little teeth? So a star washer is a washer, it's when you it's got those little they cut it and they turn them up a little bit. So what so they've got these what they're called tines. So that way when you tighten them down, it does two things. Number one, it keeps the bolt from backing out, and number two, it actually is supposed to bite into the metal of the relay rack, thus making sure that you're getting a good ground connection. Okay. Just remember, um, those little teeth aren't an accident. They are there by design. Question number 10.
Housekeeping Closeout That Wins Trust
SPEAKER_00This comes from Daniel, a structure cabling foreman with five years experience. I'm wrapping up my project as a project foreman. So a project foreman, and I want to make sure that we leave a good impression with the customer. What are some good housekeeping things that my crew should do before we call the job finished? Number one, make sure that all of your work is clean, organized, and all the desks, anything you move is put back in its original position. There's no fingerprints on the wall or the ceiling tiles. Okay? Make sure the faceplates all have labels on them. The faceplates are all level. Make sure all of the components are installed and done correctly. Okay. These tasks shouldn't wait until the project's finished. They should be performed at the end of each day. So a lot of technicians will say, well, we'll sweep up at the end of the project. No, sweep up as you go along. Or better yet, deploy a system where you capture it while you're making it. If you're cutting out holes in a wall for putting in like an NPLS, put a piece of paper on the floor underneath of you. Put a trash can right there so the dust falls into the trash can. So now your cleanup work is zero at the end of the day. Okay, make sure you get all your tools off the job site. And one of my biggest things is we technicians, we I've seen this more than one occasion. We leave boxes of old cable and pool string laying on the floor in the telecom room. Your job's not done until all of the trash and all of the debris are cleaned up everywhere. Oh, by the way, don't leave your coffee cups floating around, right? All your interpersonal lines should all be cleaned up. You may even have to vacuum. If you do vacuum, make sure that you use a HEPA-approved vacuum cleaner because gypsum board dust, when you vacuum up, it gets everywhere, even if it has a filter. All the little UTP terminations are cleaned up in the racks and not floating all over. Yes, thank you. Thank you. That's one of my big pet peeves. Because, you know, they can, if they fall on a basis on a switch, there's a chance that something could happen and cause problems down the road that's going to cause a switch to fail. Just clean everything up, right? Right, everything up. The most important thing about the installation process is not doing it at the very end. Make sure you leave that room clean, secure, and restored. It should look better than the way that you found it. The desk at that that um that that you ran a cable into the office should be left better than the way that you found it, not worse. Okay. Not worse.
Meetups, Music, And Final Sign-Off
SPEAKER_00Those are my 10 questions for the day. Man, we knocked through those pretty fast. Let me check the public chat. Alrighty. Let me see. We get lots of stuff here. I'm sorry, guys, I didn't have that phone. So private exchange. Yes, exactly. Uh new week calls for a new song. This one's called Song of a Preacher Man by Dusty Springfield. Yes, that is a great song. The best way to catch me to drive home while listening to Chuck Drive Thomas. Nice. I love that. Like, uh, there you go. Uh by the way, I do week of meetups as I travel, and I will be in Ohio next week. I'll be in Cleveland, Columbus, and Dayton, Ohio. I can do meetups if I get if enough people say they want to do them. And next year I'm gonna have I'm gonna be in Denver. I'm gonna be in the Carolinas, DC. I'll be in uh Philadelphia and Harrisburg. Lots of potential meetups. Lots of potential meetups. All right, so let me see. Tony's in the house. Hey, Tony, good to see you, my friend. No zip ties. We only use Velcro's well. Alrighty, there you go. So we're gonna knock this out because I kind of went over two minutes over today, and my computer says it is down to 4% battery. 4% battery. Chuck forgot to plug in the power cord. So until next time, everybody, remember knowledge is power.
People on this episode
Podcasts we love
Check out these other fine podcasts recommended by us, not an algorithm.
The Cabling Podcast
Cabling Installation & Maintenance
49 Volts Podcast
Josh Bowman
TKW TekTalks
TeKnowledge World Wide
Low Voltage Nation Podcast
Low Voltage Nation Podcast
The Low-Voltage Lowdown
trueCABLE